EZ Snap Fasteners

EZ-SNAP™ fasteners are a one of a kind, patented product and are only available from www.EZSNAPDIRECT.com . This amazing fastener system allows the average homeowner to install shade screen on their home or RV with professional looking results. Once the female caps are pressed onto the pins, they hold tight and do not come off in even the strongest winds. But, should you have to move or reposition the mesh, the EZ Snap caps can be removed with something as simple as a common screwdriver.
View the EZ SNAP Video on the home page.
NOTE: We recommend that fasteners are placed approximatley 12" apart, to a maximum of 15" apart. 

3M™ Adhesive Studs
These "peel and stick" studs are used when you don't want to drill into your window frames or R.V. The 3M™ VHB adhesive will stick to most clean and flat surfaces,
(except wood).
They should be installed in warmer temperatures, preferably at least +10c/50F. They should be pressed into place with a minimum of 15 lbs of pressure.
(except wood).
They should be installed in warmer temperatures, preferably at least +10c/50F. They should be pressed into place with a minimum of 15 lbs of pressure.

The chart to the right shows the approximate bonding time at room temperature. As you can see, time and temperature will significantly increase the bond strength of these type of studs. It is for this reason that we suggest that you place all of your adhesive studs first, allowing them more time to bond before you snap your product to them.
Important: * Bond strength is dependent upon the amount of
adhesive-to-surface contact developed. Firm application pressure
develops better adhesive contact and helps improve bond strength. Clean surface first with isopropyl alcohol to remove any film, dirt or oxidization. When possible, after 3M studs have been installed,wait 30 to 60 before you install shading mesh.
EZ Snap Online Store
View Cart